We specialise in premium bathroom renovations in Poznań. We carry out the full scope of works - from plumbing and electrical installations, through waterproofing of wet zones, ceramic cladding or microcement, to fitting installation and final handover. Every ARVION bathroom is completed in line with ARVION Standard - with a waterproofing test, stage-by-stage documentation and.
Book a bathroom renovation quoteWe do not carry out isolated repairs or partial renovations. We take on exclusively comprehensive projects in which we have full control over the process - from waterproofing to the final silicone bead. That is the only way to deliver a result we can stand behind.
In every ARVION bathroom the same technical standard applies: two layers of waterproofing with a minimum 24-hour water test, flexible C2S1 adhesive, a levelling system for tiles, aluminium corner profiles, and correct drainage falls. This is not an optional standard - it is our minimum.
Removal of existing built-ins, tiles and installations
Plumbing installations - hot and cold water pipes, drainage
Electrical installations - sockets, lighting, ventilation
Waterproofing of wet zones - minimum 2 layers, 24h water test
Ceramic cladding, microcement or natural stone
Plasterboard structures, WC built-ins and decorative elements
Installation of fittings, accessories and lighting
Silicone sealing and final handover with documentation
We assess the condition of existing installations, discuss the scope of work and materials. We agree on the schedule and budget.
We carry out demolition according to plan, complete new plumbing risers and runs, and install electrical systems.
We apply a minimum of two waterproofing layers. After curing we conduct a water test (minimum 24 hours) and document the result.
We lay tiles using a notched trowel with flexible C2S1 adhesive, a levelling system and even grout joints. We install plasterboard structures and decorative elements.
We install fittings, lighting and accessories. We carry out quality control and hand over the completion report with photographic documentation.
Water test of waterproofing - minimum 24 hours, result documented
Tiles always laid with flexible C2S1 adhesive, using a notched trowel
Aluminium corner profiles throughout the entire bathroom
Correct drainage pipe falls - verified before concealment
Stage-by-stage documentation - photos of concealed installations and waterproofing before cladding
Stage-by-stage documentation - photographs of every key step